Bore pits are being dug for a new fiber optic line crossing the golf course. The line will be a redundant network feed from the main campus to SLAC. Bore pits will be dug near the Clubhouse along Links Rd., between #10 cart path and the parking lot, and above the 14th green. The line will be installed using remote boring equipment, and be placed 5 feet below the 10th and 11th fairways.
Some work will also be done fastening a conduit onto the bridge over the creek at the 14th green.
The work should not affect play, but some noise and equipment will be present.
No comments:
Post a Comment