(Click photos to enlarge)
The asphalt path from the lower clubhouse parking lot to #10 tee is being replaced this week. The old path had deteriorated and was crumbling following the water line installation/construction over the winter. The new path has 6" of compacted base material and redwood headers. This should be a good path for many years to come.
nike lebron 16
ReplyDeletecheap jordans
adidas yeezy boost
golden goose sneakers
yeezy boost 350
nike air max 2019
retro jordans
cheap nfl jerseys
james harden shoes
cheap jordans